Motorists are advised of changed traffic conditions from today, Monday, October 19 on the Forster-Tuncurry Bridge to complete maintenance work.
Subscribe now for unlimited access.
$0/
(min cost $0)
or signup to continue reading
Transport for NSW will carry out the final work, including routine bridge cleaning and maintenance.
To reduce impact to motorists, work will be carried out from later this evening, Monday, October 19 between 7pm and 5am to this Thursday and then the following Monday, October 26 to Thursday, October 29.
Weather permitting, work was expected to be finished in those two weeks.
During these hours one lane will be closed with traffic control and a reduce speed limit of 40km/h, which may cause short delays.
Motorists are advised to drive to the conditions, and follow the directions of signs and traffic control.
Transport for NSW thanks motorists for their patience during this time.
For the latest traffic updates download the Live Traffic NSW App, visit livetraffic.com or call 132 701.
Stay ahead with local news by signing up for the Great Lakes Advocate newsletter here.